RISIKO USAHA BANK TERHADAP MODAL TIER 1 PADA BANK PEMBANGUNAN DAERAH

NOVIANINGTIYAS, NITA (2015) RISIKO USAHA BANK TERHADAP MODAL TIER 1 PADA BANK PEMBANGUNAN DAERAH. Undergraduate thesis, STIE PERBANAS SURABAYA.

[img]
Preview
Text
ARTIKEL ILMIAH.pdf

Download (524kB) | Preview
[img]
Preview
Text
COVER.pdf

Download (696kB) | Preview
[img]
Preview
Text
BAB I.pdf

Download (176kB) | Preview
[img]
Preview
Text
BAB II.pdf

Download (354kB) | Preview
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (332kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (489kB)
[img]
Preview
Text
BAB V.pdf

Download (322kB) | Preview
[img] Text
LAMPIRAN.pdf
Restricted to Registered users only

Download (1MB)

Abstract

The purpose of this study was to determine the influence of variables there any NPL, LDR, IPR, BOPO, FBIR, IRR and CAPITAL TIER 1 to the Regional Development Bank simultaneously or partially. The formulation of the problem in this research whether the NPL, LDR, IPR, BOPO, FBIR, IRR simultan have a significant impact on CAPITAL TIER 1. The purpose of this research was to determine how much influence the NPL, LDR, IPR, BOPO, FBIR,and IRR toward CAPITAL TIER 1. This research is research of causality, which is used to measure the relationship between independent variables and dependent variable. Independent variables used are NPL, LDR, IPR, BOPO, FBIR, IRR and dependent variable is CAPITAL TIER 1 .Documentation method to collect data from published financial statements of Bank Indonesia and linear analysis techniques for data analysis The sampling technique used was purposive sampling technique with the Regional Development Banks with criteria a total capital tier 1 of start 600 million until 900 million start from 2010-2014 for five years period. These samples were The study of three banks, namely: BPD Yogyakarta, BPD Jambi, BPD NTT. Based on the calculation and the results of using SPSS 16 for windows,stated that the NPL, LDR, IPR, BOPO,FBIR have a significant effect on CAPITAL TIER 1 in Regional Development Bank. LDR, IPR, IRR is partial insignificant negative effect on Capital Tier 1 in Regional Development Bank. NPL, BOPO partial significant negative effect on Capital Tier 1 in Regional Development. Silmutan FBIR are significant positive effect on capital Tier 1 in Regional Development. LDR, IPR, no significant positive effect and IRR unsignificant negative effect. Key words : CAPITAL TIER 1,NPL,LDR,IPR, BOPO, FBIR, IRR

Item Type: Thesis (Undergraduate)
Subjects: 300 - SOCIAL SCIENCE > 330 - 339 ECONOMICS > 332 - FINANCIAL ECONOMICS > 332.12 - BANKS & BANKING
Divisions: Bachelor of Management
Depositing User: Perpustakaan Universitas Hayam Wuruk Perbanas
Date Deposited: 19 Apr 2017 04:34
Last Modified: 19 Apr 2017 04:34
URI: http://eprints.perbanas.ac.id/id/eprint/874

Actions (login required)

View Item View Item